AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Herriman rec center2/28/2023 "For us, we do many of these ribbon cuttings, groundbreakings and different events, it’s time for us to recognize the men and women that worked on this project,” Smith said. Completing such a large facility with so many specific requirements required a strong team effort. of water each year compared to a building that just meets current code requirements. Regenerative filters reduce water usage and water waste by 30%.Īdditionally, water-conserving plumbing fixtures-including sensor faucets, low-flush/high-flush toilets and landscaping designed to conserve potable water with the use of secondary irrigation-will save more than 1 million gal. Ozone and UV aid in pool water sanitation and reduce the amount of chlorine required. ![]() Solar hot water panels on the building's roof assist in heating the pool, reducing the energy needed to warm almost 400,000 gal. Sorenson Recreation Center qualifying for LEED-Platinum certification. The facility angles due south at the pool area to maximize solar heat gain, a design feature that was a key factor in the J.L. Every area of the facility is equipped with motion light sensors that automatically turn lights off if a room is not in use. On sunny days, the gym can be fully lit by skylights that line the ceiling and determine the amount of artificial light needed, reducing the amount of electricity used on suitable weather days. Glazing is largely present throughout the building to maximize daylight and views, with large expanses in the lobby, daycare area, exercise and dance rooms, racquetball courts, along the track and in the gymnasium. Green features are prevalent throughout the completed facility. ![]() More than 95% of total waste was diverted from the landfill during construction. Nearly 75% of the wood used in the facility is Forest Stewardship Council certified-sustainable. Additionally, to meet a specific LEED requirement, all materials used in the facility are from no more than 500 miles away from the project site. The building was designed to use 40% less energy and 30% less water than a non-LEED-certified building of similar size.Ĭonstruction materials were chosen for their recycled content, lack of toxic materials and lack of emitting of harmful gases over time. It will be the first LEED-Platinum-certified recreation center in Utah and will join an elite group as one of just six projects in the state to achieve a Platinum certification. Layton and EDA worked closely to help the facility qualify for a LEED-Platinum certification from the U.S. “We estimate that there are over a half million man-hours that went into building this facility.” “One of the things that we’re most proud of is our subcontractors and the many, many workmen that worked on this project,” said Chris Smith, Layton vice president of preconstruction, at the ribbon cutting. Copper panels were an architectural theme integrated into the design to reflect the center’s surroundings and close proximity to the Kennecott Copper Mine. ![]() The completed facility includes 8,800 cu yd of concrete, 400 tons of steel and 40,000 sq ft of copper sheets. Layton started construction on the facility in June 2009 and spent almost two months getting the site ready before footings and foundation were put in place. Sorenson Recreation Center, located in Herriman, Utah, features a competition-sized indoor swimming pool with eight lanes an indoor leisure pool with slides, a lazy river and water play equipment an indoor running and walking track a 16,000-sq-ft double gymnasium six competition racquetball courts exercise and fitness equipment a dance and aerobics studio multi-use rooms and a drop-in daycare area.
0 Comments
Read More
Leave a Reply. |